What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Mahoba, Uttar Pradesh

Four Laning of MP/UP Border near Kaimaha check post to Kabrai section of NH-34 & NH-35 from Design Km 196+900 (Existing Km 187.585 of NH-34) to Design Km 242+991 (Existing Km 2.075 to Km 2.475 of NH-35) in the State of Uttar Pradesh (Package-5) under Bharatmala Pariyojana on EPC Mode

Four Laning of MP/UP Border near Kaimaha check post to Kabrai section of NH-34 & NH-35 from Design Km 196+900 (Existing Km 187.585 of NH-34) to Design Km 242+991 (Existing Km 2.075 to Km 2.475 of NH-35) in the State of Uttar Pradesh (Package-5) under Bharatmala Pariyojana on EPC Mode is an approved road project in Bilbai, Mahoba, Uttar Pradesh. The site covers 2,674.2 acres. Its stated project cost is ₹1,121.4 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 13 May 2026).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Four Laning of MP/UP Border near Kaimaha check post to Kabrai section of NH-34 & NH-35 from Design Km 196+900 (Existing Km 187.585 of NH-34) to Design Km 242+991 (Existing Km 2.075 to Km 2.475 of NH-35) in the State of Uttar Pradesh (Package-5) under Bharatmala Pariyojana on EPC Mode is an approved road project in Bilbai, Mahoba, Uttar Pradesh. The site covers 2,674.2 acres.

Who is building it?

The applicant is National Highway Authority of India Piu Chhatarpur.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 13 May 2026), as of 27 Nov 2026.

Where is it?

In Bilbai, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1,121.4 crore; a site of 2,674.2 acres and 112.8 acres (45.7 ha) of forest land.

When was it filed?

The application was filed on 23 Feb 2023.

Project details

StatusForest land use approved
Status since13 May 2026
Application filed23 Feb 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highway Authority of India Piu Chhatarpur
Land area2,674.2 acres (1,082.2 ha)
Forest land112.8 acres (45.7 ha)
Project cost₹1,121.4 crore
Village / localityBilbai
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05313

In context

12 applications in Mahoba since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 2,674.2 acres, this one is larger than 91% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bilbai, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.