Quick answers
What is this project?
Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL Retail Outlet on Kanpur-Sagar Road NH-34 (Old NH-86) in between Km No. 06 to 07 (CH. No. 06.300, RHS) at Khasra No–75, Village:- Mudhara, Tehsil:-Mahoba, District:- Mahoba is an approved fuel station in Mundhera, Mahoba, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 3 Oct 2023), as of 27 Nov 2026.
Where is it?
In Mundhera, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1 acre and 2,120 m² of forest land.
When was it filed?
The application was filed on 27 Oct 2022.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 3 Oct 2023 |
| Application filed | 27 Oct 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 4,000 m² |
| Forest land | 2,120 m² |
| Project cost | ₹60 lakh |
| Village / locality | Mundhera |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Taluk / tehsil |
| Our reference | WID-UP-05815 |
In context
6 applications in Mahoba since January 2022 are in the same category (Fuel stations): 5 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval.
Where it is
Mundhera, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Araji… — environmental approval granted, 0 m away
- Four Laning of MP/UP Border near Kaimaha check post to Kabrai section of NH-34… — forest land use approved, 500 m away
- 37 Nos. Court and other allied buildings for Integrated Court Complex — environmental approval granted, 3 km away
- 37 Nos. Court and other allied buildings for Integrated Court Complex — lapsed, 3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 4.2 km away
- Proposed District Jail complex (990 capacity) at Mahoba, Uttar Pradesh — environmental approval granted, 4.7 km away
- Rob at Km. 168+231 on NH-76 With Approaches in the State of Uttar Pradesh on… — more information requested, 5 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 5.4 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Mahoba
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
3 Hindustan Petroleum Corporation (HPCL) projects in Mahoba
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.