Quick answers
What is River Bed Sand/ Morrum Mining?
River Bed Sand/ Morrum Mining is an approved mining project in Erich, Garautha, Jhansi, Uttar Pradesh. The site covers 5.9 acres.
Who is building it?
The applicant is Harishankar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Oct 2023), as of 27 Nov 2026.
Where is it?
In Erich, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4.2 crore and a site of 5.9 acres.
When was it filed?
The application was filed on 16 Oct 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2023 |
| Application filed | 16 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Harishankar |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹4.2 crore |
| Village / locality | Erich |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01386 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.9 acres, this one is larger than 55% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Erich, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 3 km away
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 3 km away
- Sand/Moram Mining Project at Betwa River Bed, Gata No. 2118, 2119, Khand No.… — lapsed, 3.4 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — lapsed, 3.5 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 3.5 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — lapsed, 3.5 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — environmental approval granted, 3.8 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 3.8 km away
More from Harishankar in Jhansi
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — under environmental review
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.