Quick answers
What is this project?
Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River Betwa at Arazi No. 321 Ga, area 10.0 ha Village- Salemapur, Tehsil- Moth, District- Jhansi, Uttar Pradesh of M/s P.S.A. Contractor L.L.P. Partner. Shri Pankaj Singh is a lapsed mining project in Salemapur, Moth, Jhansi, Uttar Pradesh. The site covers 24.7 acres.
Who is building it?
The applicant is Pankaj Singh.
Has it been approved?
No. The application was lapsed on 29 May 2026, so it is no longer under consideration.
Where is it?
In Salemapur, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹10.7 crore and a site of 24.7 acres.
When was it filed?
The application was filed on 30 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River Betwa at…
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 May 2026 |
| Application filed | 30 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pankaj Singh |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹10.7 crore |
| Village / locality | Salemapur |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03383 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Dec 2025 (this page) | Lapsed | 24.7 acres | ₹10.7 crore |
| Early planning filed 17 Jan 2025 | Cleared for impact study | 24.7 acres | ₹10.7 crore |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.7 acres, this one is larger than 74% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 40.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Salemapur, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River… — cleared for impact study, 0 m away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — lapsed, 0 m away
- Sand/Moram Mining Project at Betwa River Bed, Gata No. 2118, 2119, Khand No.… — lapsed, 450 m away
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 1.4 km away
- Laying of 24 F of Cable From Moth Bsnl Telephone Exchange to Ait Bsnl… — lapsed, 1.4 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — cleared for impact study, 1.8 km away
- River Bed Sand/ Morrum Mining — environmental approval granted, 3.5 km away
- Proposed Diversion for Laying of Water Distribution Line along Gursarai-Erach… — more information requested, 3.6 km away
More from Pankaj Singh in Jhansi
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.