What is Developing? Open the mapMap

Cleared for impact studyMining · Jhansi, Uttar Pradesh

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River Betwa at Gata No. 1129, Area 12.140 ha

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River Betwa at Gata No. 1129, Area 12.140 ha is a proposed mining project in Dhikauli, Garautha, Jhansi, Uttar Pradesh. The site covers 30 acres. Its stated project cost is ₹49 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 Nov 2023).

See it on the live map All projects in Jhansi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River Betwa at Gata No. 1129, Area 12.140 ha is a proposed mining project in Dhikauli, Garautha, Jhansi, Uttar Pradesh. The site covers 30 acres.

Who is building it?

The applicant is Ram Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 8 Nov 2023), as of 27 Nov 2026.

Where is it?

In Dhikauli, Garautha, Jhansi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹49 lakh and a site of 30 acres.

When was it filed?

The application was filed on 8 Nov 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River Betwa at Gata…

Project details

Official titleProposed Project of riverbed "Sand/Morrum Mining" on the riverbed of River Betwa at Gata No. 1129, Area 12.140 ha in Village- Dikauli, Tehsil- Garautha, District- Jhansi, Uttar Pradesh
StatusCleared for impact study
Status since8 Nov 2023
Application filed8 Nov 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRam Singh
Land area30 acres (12.1 ha)
Project cost₹49 lakh
Village / localityDhikauli
Taluk / tehsilGarautha
DistrictJhansi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00351

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 7 Oct 2024Environmental approval granted30 acres₹49 lakh
Early planning filed 8 Nov 2023 (this page)Cleared for impact study30 acres₹49 lakh

In context

211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is larger than 78% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Dhikauli, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.