Quick answers
What is this project?
"Sand/Morrum Mine" located at Gata No. 4032/15, Village – Parasan, Tehsil- Kalpi, District- Jalaun (U.P.),M/S Saloni Enterprises Prop. Shri Subodh Singh is an approved mining project in Parasan, Kalpi, Jalaun, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Subodh Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Jan 2026), as of 27 Nov 2026.
Where is it?
In Parasan, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 3 acres.
When was it filed?
The application was filed on 4 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Jan 2026 |
| Application filed | 4 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Subodh Singh |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Parasan |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03415 |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Parasan, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining Project — environmental approval granted, 4.8 km away
- Sand/Morrum Mining Project — cleared for impact study, 4.8 km away
- Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres)… — environmental approval granted, 5 km away
- Riverbed Sand/Morrum Mining Project Having Lease Area-12.120 Ha (30.0 Acres)… — cleared for impact study, 5 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 5.3 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 5.3 km away
- Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River… — environmental approval granted, 5.4 km away
- Riverbed Sand/Morrum Mining Project having lease area- 20.20 ha along River… — cleared for impact study, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.