Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a lapsed mining project in Chikasi, Sarila, Hamirpur, Uttar Pradesh. The site covers 90 acres.
Who is building it?
The applicant is Sadhna Rajput.
Has it been approved?
No. The application was lapsed on 10 Jan 2025, so it is no longer under consideration.
Where is it?
In Chikasi, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 90 acres.
When was it filed?
The application was filed on 19 Nov 2024.
One of 5 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Chikasi, Khand No.- 24/14, Lease Area- 36.4370 Ha. (90 Acres), Tehsil- Sarila, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Maa Raktdantika Construction (Prop.- Smt. Sadhna Rajput) |
|---|---|
| Status | Lapsed |
| Status since | 10 Jan 2025 |
| Application filed | 19 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sadhna Rajput |
| Land area | 90 acres (36.4 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Chikasi |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01580 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Feb 2026 | Under environmental review | 82.5 acres | ₹32 crore |
| New project filed 1 Nov 2025 | Environmental approval granted | 77.6 acres | ₹14.8 crore |
| Early planning filed 23 May 2025 | Cleared for impact study | 82.5 acres | ₹32 crore |
| Early planning filed 21 Apr 2025 | Cleared for impact study | 77.6 acres | ₹14.8 crore |
| Early planning filed 19 Nov 2024 (this page) | Lapsed | 90 acres | ₹90 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Chikasi, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 0 m away
- Proposed project of Sand/Morrum Mining project at Khand No.-24/13, Gata No.-… — under environmental review, 550 m away
- Riverbed Sand/Morrum Mining Project from Gata No./Khand No. 24/15, Village-… — lapsed, 650 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 650 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 650 m away
- Chikasi Sand/Morrum Mining Project on Betwa River — environmental approval granted, 1.6 km away
- Chikasi Sand/Morrum Mining Project on Betwa River — cleared for impact study, 1.6 km away