Quick answers
What is this project?
Proposed project of Sand/Morrum Mining project at Khand No.-24/13, Gata No.- 01, 02, 323/214, Area- 14.0 ha, Village– Chikasi, Sujagwa, Tehsil– Sarila, District- Hamirpur (U.P.) by M/s Aadinatha Contractors, Prop. Smt Rekha Singh is a proposed mining project in Chikasi, Sarila, Hamirpur, Uttar Pradesh. The site covers 34.6 acres.
Who is building it?
The applicant is Rekha Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chikasi, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 34.6 acres.
When was it filed?
The application was filed on 7 Apr 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 4 Nov 2026 |
| Application filed | 7 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rekha Singh |
| Land area | 34.6 acres (14 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Chikasi |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04092 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 34.6 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Chikasi, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 550 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 550 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — lapsed, 550 m away
- Chikasi Sand/Morrum Mining Project on Betwa River — environmental approval granted, 1.1 km away
- Chikasi Sand/Morrum Mining Project on Betwa River — cleared for impact study, 1.1 km away
- Riverbed Sand/Morrum Mining Project from Gata No./Khand No. 24/15, Village-… — lapsed, 1.2 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 1.2 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.