What is Chikasi Sand/Morrum Mining Project on Betwa River?
Chikasi Sand/Morrum Mining Project on Betwa River is an approved mining project in Chikasi, Sarila, Hamirpur, Uttar Pradesh. The site covers 20.6 acres.
Who is building it?
The applicant is Gulab Dangi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Aug 2023), as of 27 Nov 2026.
Where is it?
In Chikasi, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹78 lakh and a site of 20.6 acres.
When was it filed?
The application was filed on 25 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Aug 2023 |
| Application filed | 25 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gulab Dangi |
| Land area | 20.6 acres (8.3 ha) |
| Project cost | ₹78 lakh |
| Village / locality | Chikasi |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00346 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Aug 2023 (this page) | Environmental approval granted | 20.6 acres | ₹78 lakh |
| Early planning filed 8 Feb 2023 | Cleared for impact study | 20.6 acres | ₹78 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.6 acres, this one is smaller than 96% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Chikasi, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chikasi Sand/Morrum Mining Project on Betwa River — cleared for impact study, 0 m away
- Proposed project of Sand/Morrum Mining project at Khand No.-24/13, Gata No.-… — under environmental review, 1.1 km away
- Proposed Project of "Sand/Morrum Mine" Gata No. 01, 02, 03, 04, 05, 06, 01,… — cleared for impact study, 1.4 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 1.6 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 1.6 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — lapsed, 1.6 km away
- River Bed Sand/ Morrum Mining from Betwa River — cleared for impact study, 1.9 km away
- Riverbed Sand/Morrum Mining Project from Gata No./Khand No. 24/15, Village-… — lapsed, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.