Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Chikasi, Sarila, Hamirpur, Uttar Pradesh. The site covers 82.5 acres.
Who is building it?
The applicant is Sadhna Rajput.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Oct 2025), as of 27 Nov 2026.
Where is it?
In Chikasi, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹32 crore and a site of 82.5 acres.
When was it filed?
The application was filed on 23 May 2025.
One of 5 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Chikasi, Khand No.- 24/14, Gata No.- 01, 14/12, Lease Area- 33.382 Ha. (82.45 Acres), Tehsil- Sarila, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Maa Raktdantika Construction (Prop. - Smt. Sadhna Rajput) |
|---|---|
| Status | Cleared for impact study |
| Status since | 6 Oct 2025 |
| Application filed | 23 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sadhna Rajput |
| Land area | 82.5 acres (33.4 ha) |
| Project cost | ₹32 crore |
| Village / locality | Chikasi |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02960 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Feb 2026 | Under environmental review | 82.5 acres | ₹32 crore |
| New project filed 1 Nov 2025 | Environmental approval granted | 77.6 acres | ₹14.8 crore |
| Early planning filed 23 May 2025 (this page) | Cleared for impact study | 82.5 acres | ₹32 crore |
| Early planning filed 21 Apr 2025 | Cleared for impact study | 77.6 acres | ₹14.8 crore |
| Early planning filed 19 Nov 2024 | Lapsed | 90 acres | ₹90 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 82.5 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Chikasi, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — lapsed, 0 m away
- Proposed project of Sand/Morrum Mining project at Khand No.-24/13, Gata No.-… — under environmental review, 550 m away
- Riverbed Sand/Morrum Mining Project from Gata No./Khand No. 24/15, Village-… — lapsed, 650 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 700 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 700 m away
- Chikasi Sand/Morrum Mining Project on Betwa River — environmental approval granted, 1.6 km away
- Chikasi Sand/Morrum Mining Project on Betwa River — cleared for impact study, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.