Cleared for impact studyMining · Banda, Uttar Pradesh

Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478, 6497, 6595, 6597, 6598, Area - 10.0 ha, Village - Badausa, Tehsil - Atara, District - Banda, Uttar Pradesh

Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478, 6497, 6595, 6597, 6598, Area - 10.0 ha, Village - Badausa, Tehsil - Atara, District - Banda, Uttar Pradesh is a proposed mining project in Badausa, Atarra, Banda, Uttar Pradesh. The site covers 55.1 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 10 Jun 2025).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478, 6497, 6595, 6597, 6598, Area - 10.0 ha, Village - Badausa, Tehsil - Atara, District - Banda, Uttar Pradesh is a proposed mining project in Badausa, Atarra, Banda, Uttar Pradesh. The site covers 55.1 acres.

Who is building it?

The applicant is Keshari Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 10 Jun 2025), as of 27 Nov 2026.

Where is it?

In Badausa, Atarra, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹85 lakh and a site of 55.1 acres.

When was it filed?

The application was filed on 5 Dec 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478, 6497, 6595,…

Project details

StatusCleared for impact study
Status since10 Jun 2025
Application filed5 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantKeshari Singh
Land area55.1 acres (22.3 ha)
Project cost₹85 lakh
Village / localityBadausa
Taluk / tehsilAtarra
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01628

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Sept 2025Environmental approval granted55.1 acres₹85 lakh
Early planning filed 5 Dec 2024 (this page)Cleared for impact study55.1 acres₹85 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 55.1 acres, this one is larger than 81% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 79.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Badausa, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.