Quick answers
What is this project?
Transfer of Environment Clearance (EC) of Riverbed Sand/Morrum mining project from Riverbed of Baghen River located at Gata No. 2494, Village- Chandaur, Tehsil- Atarra, District- Banda, U.P is a lapsed mining project in Chandaur, Atarra, Banda, Uttar Pradesh. The site covers 19.3 acres.
Who is building it?
The applicant is Jmd Group.
Has it been approved?
No. The application was lapsed on 28 Aug 2026, so it is no longer under consideration.
Where is it?
In Chandaur, Atarra, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹6 lakh and a site of 19.3 acres.
When was it filed?
The application was filed on 3 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Aug 2026 |
| Application filed | 3 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Jmd Group |
| Land area | 19.3 acres (7.8 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Chandaur |
| Taluk / tehsil | Atarra |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03355 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 19.3 acres, this one is smaller than 74% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Chandaur, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Baghain River — lapsed, 0 m away
- Proposed riverbed sand/morrum mining project from Baghen River of M/s JMD… — lapsed, 0 m away
- Sand Morrum Bajri mine, Village Badausa (Gata/Araji No.- 6261, 6262, 6478,… — environmental approval granted, 2.9 km away
- Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478,… — environmental approval granted, 3.1 km away
- Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478,… — cleared for impact study, 3.1 km away
- Protected Forest Land proposed to be diverted for the construction of Major… — initial checks, 6.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 7.3 km away
- "Riverbed Sand/Morrum" Mining from Riverbed of Baghein River from Village-… — environmental approval granted, 7.7 km away
More from Jmd Group in Banda
- "Sand/Morrum Mining" from Riverbed of Yamuna River — initial checks
- "Sand/Morrum Mining" from Riverbed of Baghain River — lapsed
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review
- Proposed riverbed sand/morrum mining project from Baghen River of M/s JMD… — lapsed