What is Developing? Open the mapMap

Environmental approval grantedMining · Banda, Uttar Pradesh

Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478, 6497, 6595, 6597, 6598, Area - 10.0 ha, Village - Badausa, Tehsil - Atara, District - Banda, Uttar Pradesh

Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478, 6497, 6595, 6597, 6598, Area - 10.0 ha, Village - Badausa, Tehsil - Atara, District - Banda, Uttar Pradesh is an approved mining project in Badausa, Atarra, Banda, Uttar Pradesh. The site covers 55.1 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Feb 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478, 6497, 6595, 6597, 6598, Area - 10.0 ha, Village - Badausa, Tehsil - Atara, District - Banda, Uttar Pradesh is an approved mining project in Badausa, Atarra, Banda, Uttar Pradesh. The site covers 55.1 acres.

Who is building it?

The applicant is Keshari Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.

Where is it?

In Badausa, Atarra, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹85 lakh and a site of 55.1 acres.

When was it filed?

The application was filed on 16 Sept 2025.

Project details

StatusEnvironmental approval granted
Status since9 Feb 2026
Application filed16 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantKeshari Singh
Land area55.1 acres (22.3 ha)
Project cost₹85 lakh
Village / localityBadausa
Taluk / tehsilAtarra
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03711

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Sept 2025 (this page)Environmental approval granted55.1 acres₹85 lakh
Early planning filed 5 Dec 2024Cleared for impact study55.1 acres₹85 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 55.1 acres, this one is larger than 81% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 79.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Badausa, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Keshari Singh in Banda

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.