Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Baghen River of M/s JMD Group, Prop. Shri Vikas Pandey, located at Gata No. 2494, Village - Chandaur, Tehsil - Atarra, District - Banda, Uttar-Pradesh. Sanctioned Lease Area- 7.80 ha (19.27 acre) is a lapsed mining project in Chandaur, Atarra, Banda, Uttar Pradesh. The site covers 19.3 acres.
Who is building it?
The applicant is Jmd Group.
Has it been approved?
No. The application was lapsed on 8 May 2026, so it is no longer under consideration.
Where is it?
In Chandaur, Atarra, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹72 lakh and a site of 19.3 acres.
When was it filed?
The application was filed on 26 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 May 2026 |
| Application filed | 26 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jmd Group |
| Land area | 19.3 acres (7.8 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Chandaur |
| Taluk / tehsil | Atarra |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03242 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 19.3 acres, this one is smaller than 74% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Chandaur, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Baghain River — lapsed, 0 m away
- Transfer of Environment Clearance (EC) of Riverbed Sand/Morrum mining project… — lapsed, 0 m away
- Sand Morrum Bajri mine, Village Badausa (Gata/Araji No.- 6261, 6262, 6478,… — environmental approval granted, 2.9 km away
- Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478,… — environmental approval granted, 3.1 km away
- Sand/Morrum Mining at Riverbed of Baghane River, Gata Nos. 6261, 6262, 6478,… — cleared for impact study, 3.1 km away
- Protected Forest Land proposed to be diverted for the construction of Major… — initial checks, 6.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 7.3 km away
- "Riverbed Sand/Morrum" Mining from Riverbed of Baghein River from Village-… — environmental approval granted, 7.7 km away
More from Jmd Group in Banda
- "Sand/Morrum Mining" from Riverbed of Yamuna River — initial checks
- "Sand/Morrum Mining" from Riverbed of Baghain River — lapsed
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review
- Transfer of Environment Clearance (EC) of Riverbed Sand/Morrum mining project… — lapsed
All 5 Jmd Group projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.