Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Yamuna River of M/s Teerth Enterprises, Prop. Smt. Parul Yadav, located at Gata No. 21 (Khand No. 01), Village- Charkakhadar, Tehsil- Baberu, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 12.49 ha (30.88 acre) is a proposed mining project in Charka, Baberu, Banda, Uttar Pradesh. The site covers 30.9 acres.
Who is building it?
The applicant is Teerth Enterprises.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Apr 2024), as of 27 Nov 2026.
Where is it?
In Charka, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹49 lakh and a site of 30.9 acres.
When was it filed?
The application was filed on 4 Jan 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Apr 2024 |
| Application filed | 4 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Teerth Enterprises |
| Land area | 30.9 acres (12.5 ha) |
| Project cost | ₹49 lakh |
| Village / locality | Charka |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01658 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Apr 2026 | More information requested | 30.9 acres | ₹49 lakh |
| Early planning filed 4 Jan 2024 (this page) | Cleared for impact study | 30.9 acres | ₹49 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30.9 acres, this one is smaller than 55% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 85.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Charka, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Teerth… — more information requested, 0 m away
- Sand/Morrum Mining from Yamuna Riverbed — environmental approval granted, 400 m away
- Sand/Morrum Mining from Yamuna Riverbed — under environmental review, 400 m away
- "Charkakhadar Sand/Morrum Mining" on the riverbed of Yamuna River, at Gata… — environmental approval granted, 400 m away
- "Charkakhadar Sand/Morrum Mining" on the riverbed of Yamuna River, at Gata… — cleared for impact study, 400 m away
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — cleared for impact study, 650 m away
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — environmental approval granted, 650 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.