Quick answers
What is Sand/Morrum Mining from Yamuna Riverbed?
Sand/Morrum Mining from Yamuna Riverbed is a proposed mining project in Charka, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres.
Who is building it?
The applicant is Shrikant Rajput.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Charka, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5.7 crore and a site of 27.2 acres.
When was it filed?
The application was filed on 23 Mar 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mining from Yamuna Riverbed
Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 23 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shrikant Rajput |
| Land area | 27.2 acres (11 ha) |
| Project cost | ₹5.7 crore |
| Village / locality | Charka |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04375 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Aug 2026 | Environmental approval granted | 27.2 acres | ₹5.7 crore |
| Early planning filed 23 Mar 2026 (this page) | Under environmental review | 27.2 acres | ₹5.7 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.2 acres, this one is smaller than 64% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 112.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Charka, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining from Yamuna Riverbed — environmental approval granted, 0 m away
- "Charkakhadar Sand/Morrum Mining" on the riverbed of Yamuna River, at Gata… — environmental approval granted, 0 m away
- "Charkakhadar Sand/Morrum Mining" on the riverbed of Yamuna River, at Gata… — cleared for impact study, 0 m away
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — cleared for impact study, 250 m away
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — environmental approval granted, 250 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Teerth… — more information requested, 400 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Teerth… — cleared for impact study, 400 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.