What is Developing? Open the mapMap

Cleared for impact studyMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack Holidays Pvt. Ltd., Director- Shri Jitendra Patel S/o Shri Naresh Bhai Patel, located at Gata No. 133 & 134 (Khand No. 01), Village – Barehata Khadar, Tehsil - Pailani, District - Banda, Uttar-Pradesh. Sanctioned Lease Area- 15.654 ha

Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack Holidays Pvt. Ltd., Director- Shri Jitendra Patel S/o Shri Naresh Bhai Patel, located at Gata No. 133 & 134 (Khand No. 01), Village – Barehata Khadar, Tehsil - Pailani, District - Banda, Uttar-Pradesh. Sanctioned Lease Area- 15.654 ha is a proposed mining project in Amara, Banda, Uttar Pradesh. The site covers 38.7 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 May 2025).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack Holidays Pvt. Ltd., Director- Shri Jitendra Patel S/o Shri Naresh Bhai Patel, located at Gata No. 133 & 134 (Khand No. 01), Village – Barehata Khadar, Tehsil - Pailani, District - Banda, Uttar-Pradesh. Sanctioned Lease Area- 15.654 ha is a proposed mining project in Amara, Banda, Uttar Pradesh. The site covers 38.7 acres.

Who is building it?

The applicant is Gypsy Shack Holidays Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 May 2025), as of 27 Nov 2026.

Where is it?

In Amara, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 38.7 acres.

When was it filed?

The application was filed on 23 Jan 2025.

Project details

StatusCleared for impact study
Status since29 May 2025
Application filed23 Jan 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantGypsy Shack Holidays Private Limited
Land area38.7 acres (15.7 ha)
Project cost₹1.1 crore
Village / localityAmara
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03214

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 15 May 2026More information requested38.7 acres₹1.1 crore
Early planning filed 23 Jan 2025 (this page)Cleared for impact study38.7 acres₹1.1 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 38.7 acres, this one is larger than 52% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 95.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.

Where it is

Amara, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.