Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack Holidays Pvt. Ltd., Director- Shri Jitendra Patel S/o Shri Naresh Bhai Patel, located at Gata No. 133 & 134 (Khand No. 01), Village – Barehata Khadar, Tehsil - Pailani, District - Banda, Uttar-Pradesh. Sanctioned Lease Area- 15.654 ha is a proposed mining project in Amara, Banda, Uttar Pradesh. The site covers 38.7 acres.
Who is building it?
The applicant is Gypsy Shack Holidays Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Amara, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 38.7 acres.
When was it filed?
The application was filed on 15 May 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack Holidays…
Project details
| Status | More information requested |
|---|---|
| Status since | 10 Oct 2026 |
| Application filed | 15 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gypsy Shack Holidays Private Limited |
| Land area | 38.7 acres (15.7 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Amara |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04575 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 May 2026 (this page) | More information requested | 38.7 acres | ₹1.1 crore |
| Early planning filed 23 Jan 2025 | Cleared for impact study | 38.7 acres | ₹1.1 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 38.7 acres, this one is larger than 52% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 95.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Amara, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack… — cleared for impact study, 0 m away
- "Sand/Morrum Mining" from Riverbed of ken River — under environmental review, 500 m away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — environmental approval granted, 1.3 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — cleared for impact study, 1.3 km away
- Proposed Project of riverbed "Sand/ Morrum Mining Project" on the riverbed of… — under environmental review, 1.8 km away
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.-… — environmental approval granted, 2.4 km away
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.-… — cleared for impact study, 2.4 km away
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.