Project details
| Official title | Sand/Morrum mining from Riverbed of Baghain River, at Gata/Khand No. 248, 1112/1, Lease Area-0.83 ha (2.05 Acre) at Village-Pahadiya Bujurg Sani, Tehsil-Karwi, District-Chitrakoot, Uttar Pradesh of M/s A.V. Infratech |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 Apr 2025 |
| Application filed | 27 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vivek Kumar |
| Land area | 2.1 acres (0.8 ha) |
| Project cost | ₹27 lakh |
| Village / locality | Pahari Buzurg |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01711 |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.1 acres, this one is smaller than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Pahari Buzurg, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to UPEIDA Plans a 15-Kilometre Chitrakoot Link Expressway in Uttar Pradesh (12.6 km away).
Other projects nearby
- Proposed Diversion for construction of Inter change on Bundelkhand Expressway… — forest land use approved, 10.3 km away
- Protected Forest Land Proposed to be Diverted For Entry/ Exit Approach to… — under forest review, 10.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 11 km away
- Environmental Clearance for Proposed Granite-Imarati Patthar (Khanda, Gitty,… — environmental approval granted, 11.2 km away
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Mining Project in… — cleared for impact study, 11.3 km away
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — lapsed, 11.4 km away
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — cleared for impact study, 11.4 km away
- Building Stone (Granite Khanda / Gitti / Boulder / Pahadi Lal Morrum) Mining… — under environmental review, 11.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.