What is this project?
Expansion of Paper Production Capacity from 46,800 TPA to 81,900 TPA and Bleached Pulp Production Capacity from 24,150 BD TPA to 41,400 BD TPA, Chemical Recovery Island, Captive Co-generation Power Plant Capacity from 8.8 MW to 23.8 MW in the existing plant premises by M/s. Pakka Limited is a withdrawn industrial project in Para Khin, Faizabad, Ayodhya, Uttar Pradesh. The site covers 76 acres.
Who is building it?
The applicant is Pakka Limited.
Has it been approved?
No. The application was withdrawn on 24 May 2024, so it is no longer under consideration.
Where is it?
In Para Khin, Faizabad, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹979.7 crore and a site of 76 acres.
When was it filed?
The application was filed on 20 May 2024.
Project details
| Official title | Expansion of Paper Production Capacity from 46,800 TPA to 81,900 TPA and Bleached Pulp Production Capacity from 24,150 BD TPA to 41,400 BD TPA, Chemical Recovery Island, Captive Co-generation Power Plant Capacity from 8.8 MW to 23.8 MW in the existing plant premises at Village Parakhan & Rampur Halwara, Tehsil Sadar, District Ayodhya, Uttar Pradesh by M/s. Pakka Limited |
|---|---|
| Status | Withdrawn |
| Status since | 24 May 2024 |
| Application filed | 20 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pakka Limited |
| Land area | 76 acres (30.8 ha) |
| Project cost | ₹979.7 crore |
| Village / locality | Para Khin |
| Taluk / tehsil | Faizabad |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01756 |
In context
6 applications in Ayodhya since January 2022 are in the same category (Industry): 4 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Para Khin, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and… — environmental approval granted, 0 m away
- Expansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and… — cleared for impact study, 0 m away
- Environmental clearance for "Maharashtra Bhawan (Bhakt Niwas)" at Plot No.… — environmental approval granted, 3.9 km away
- Lemon Tree Premier Hotel — under environmental review, 4.1 km away
- Lemon Tree Premier Hotel — withdrawn, 4.1 km away
- Plotting & Development of Greenfield Township Yojna — environmental approval granted, 4.3 km away
- "Ordinary Earth Mine", Village- Manjhamudadiha, Faizabad, Gata No.- 1K, 2, 3,… — environmental approval granted, 4.6 km away
- Ordinary Sand Mine — initial checks, 4.7 km away
More from Pakka Limited in Ayodhya
- Expansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and… — environmental approval granted
- Expansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and… — cleared for impact study
All 3 Pakka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.