What is Developing? Open the mapMap

Cleared for impact studyIndustry · Ayodhya, Uttar Pradesh

Expansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and Bleached Pulp Production Capacity from 24,150 BD TPA to 41,400 BD TPA, Chemical Recovery Island, Captive co-generation Power Plant Capacity from 8.8 MW to 23.8 MW in the existing plant premises by M/s. Pakka Limited

Expansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and Bleached Pulp Production Capacity from 24,150 BD TPA to 41,400 BD TPA, Chemical Recovery Island, Captive co-generation Power Plant Capacity from 8.8 MW to 23.8 MW in the existing plant premises by M/s. Pakka Limited is a proposed industrial project in Para Khin, Faizabad, Ayodhya, Uttar Pradesh. The site covers 76 acres. Its stated project cost is ₹979.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Jun 2024).

See it on the live map All projects in Ayodhya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and Bleached Pulp Production Capacity from 24,150 BD TPA to 41,400 BD TPA, Chemical Recovery Island, Captive co-generation Power Plant Capacity from 8.8 MW to 23.8 MW in the existing plant premises by M/s. Pakka Limited is a proposed industrial project in Para Khin, Faizabad, Ayodhya, Uttar Pradesh. The site covers 76 acres.

Who is building it?

The applicant is Pakka Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Jun 2024), as of 27 Nov 2026.

Where is it?

In Para Khin, Faizabad, Ayodhya, Uttar Pradesh.

How big is it?

It has a stated cost of ₹979.7 crore and a site of 76 acres.

When was it filed?

The application was filed on 7 Jun 2024.

Project details

Official titleExpansion of Paper Production Capacity from 46,800 TPA to 84,900 TPA and Bleached Pulp Production Capacity from 24,150 BD TPA to 41,400 BD TPA, Chemical Recovery Island, Captive co-generation Power Plant Capacity from 8.8 MW to 23.8 MW in the existing plant premises At Village- Parakhan & Rampur Halwara, Tehsil- Sadar, District- Ayodhya, Uttar Pradesh by M/s. Pakka Limited
StatusCleared for impact study
Status since13 Jun 2024
Application filed7 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPakka Limited
Land area76 acres (30.8 ha)
Project cost₹979.7 crore
Village / localityPara Khin
Taluk / tehsilFaizabad
DistrictAyodhya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02385

In context

6 applications in Ayodhya since January 2022 are in the same category (Industry): 4 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Para Khin, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pakka Limited in Ayodhya

All 3 Pakka projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.