Quick answers
What is "Sand/Morrum Mining" from Riverbed of Yamuna River?
"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Charka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres.
Who is building it?
The applicant is Suraj Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Charka Khadar, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 27.2 acres.
When was it filed?
The application was filed on 11 Nov 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Yamuna River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Yamuna River at Village- Charka Khadar, Gata No.- 21 (Khand No.- 07), Lease Area- 11.00 ha. (27.18 acres), Tehsil- Baberu, District- Banda, Uttar Pradesh, Project Proponent- Shri Suraj Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 May 2025 |
| Application filed | 11 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Suraj Singh |
| Land area | 27.2 acres (11 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Charka Khadar |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01878 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Apr 2026 | Environmental approval granted | 27.2 acres | ₹95 lakh |
| Early planning filed 11 Nov 2024 (this page) | Cleared for impact study | 27.2 acres | ₹95 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.2 acres, this one is smaller than 64% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 135.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Charka Khadar, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 0 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — more information requested, 250 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — cleared for impact study, 250 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 300 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 300 m away
- Sand/Morrum Mining at Yamuna River Bed over and area of 11.00 Ha./ 27.18 Acer… — under environmental review, 450 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — environmental approval granted, 450 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — cleared for impact study, 450 m away
More from Suraj Singh in Banda
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.