Quick answers
What is "Sand/Morrum Mining" from Riverbed of Yamuna River?
"Sand/Morrum Mining" from Riverbed of Yamuna River is an approved mining project in Charka, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres.
Who is building it?
The applicant is Suraj Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 May 2025), as of 27 Nov 2026.
Where is it?
In Charka, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹98 lakh and a site of 27.2 acres.
When was it filed?
The application was filed on 18 Jan 2025.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Yamuna River at Village- Charka Khadar, Gata No.- 21 (Khand No.- 08), Area- 11.00 ha. (27.18 acres), Tehsil- Baberu, District- Banda, Uttar Pradesh, Project Proponent- Shri Suraj Singh |
|---|---|
| Status | Environmental approval granted |
| Status since | 26 May 2025 |
| Application filed | 18 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Suraj Singh |
| Land area | 27.2 acres (11 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Charka |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03329 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Jan 2025 (this page) | Environmental approval granted | 27.2 acres | ₹98 lakh |
| Early planning filed 20 Apr 2024 | Cleared for impact study | 27.2 acres | ₹98 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.2 acres, this one is smaller than 64% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 487.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Charka, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 0 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 300 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 300 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — environmental approval granted, 300 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — cleared for impact study, 300 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — more information requested, 550 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — cleared for impact study, 550 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 700 m away
More from Suraj Singh in Banda
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.