Cleared for impact studyMining · Banda, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Yamuna River

"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Charka, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres. Its stated project cost is ₹98 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 15 Oct 2024).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Yamuna River?

"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Charka, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres.

Who is building it?

The applicant is Suraj Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 15 Oct 2024), as of 27 Nov 2026.

Where is it?

In Charka, Baberu, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹98 lakh and a site of 27.2 acres.

When was it filed?

The application was filed on 20 Apr 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Yamuna River

Project details

Official title"Sand/Morrum Mining" from Riverbed of Yamuna River at Village- Charka Khadar, Gata No.- 21 (Khand No.- 08), Area- 11.00 ha. (27.18 acres), Tehsil- Baberu, District- Banda, Uttar Pradesh, Project Proponent- Shri Suraj Singh
StatusCleared for impact study
Status since15 Oct 2024
Application filed20 Apr 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSuraj Singh
Land area27.2 acres (11 ha)
Project cost₹98 lakh
Village / localityCharka
Taluk / tehsilBaberu
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02012

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Jan 2025Environmental approval granted27.2 acres₹98 lakh
Early planning filed 20 Apr 2024 (this page)Cleared for impact study27.2 acres₹98 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.2 acres, this one is smaller than 64% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 487.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Charka, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Suraj Singh in Banda

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.