What is Developing? Open the mapMap

Environmental approval grantedMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo Crusher Mining Pvt. Ltd, located at Gata No. - 21 (Khand No.-09), Village– Charka Khadar, Tehsil - Baberu, District- Banda, U.P. Sanctioned Lease Area- 11.00 ha (27.18 acre)

Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo Crusher Mining Pvt. Ltd, located at Gata No. - 21 (Khand No.-09), Village– Charka Khadar, Tehsil - Baberu, District- Banda, U.P. Sanctioned Lease Area- 11.00 ha (27.18 acre) is an approved mining project in Dera Arwari, Baberu, Banda, Uttar Pradesh. The site covers 433.1 acres. Its stated project cost is ₹49.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Feb 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo Crusher Mining Pvt. Ltd, located at Gata No. - 21 (Khand No.-09), Village– Charka Khadar, Tehsil - Baberu, District- Banda, U.P. Sanctioned Lease Area- 11.00 ha (27.18 acre) is an approved mining project in Dera Arwari, Baberu, Banda, Uttar Pradesh. The site covers 433.1 acres.

Who is building it?

The applicant is Neo Crusher Mining Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.

Where is it?

In Dera Arwari, Baberu, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹49.7 crore and a site of 433.1 acres.

When was it filed?

The application was filed on 18 Oct 2025.

Project details

StatusEnvironmental approval granted
Status since9 Feb 2026
Application filed18 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantNeo Crusher Mining Private Limited
Land area433.1 acres (175.3 ha)
Project cost₹49.7 crore
Village / localityDera Arwari
Taluk / tehsilBaberu
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03642

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Oct 2025 (this page)Environmental approval granted433.1 acres₹49.7 crore
Early planning filed 24 Aug 2024Cleared for impact study433.1 acres₹49.7 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 433.1 acres, this one is larger than 99% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 487.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Dera Arwari, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Neo Crusher Mining Private Limited in Banda

3 Neo Crusher Mining projects in Banda
All 5 Neo Crusher Mining projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.