Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo Crusher Mining Pvt. Ltd, located at Gata No. - 21 (Khand No.-09), Village– Charka Khadar, Tehsil - Baberu, District- Banda, U.P. Sanctioned Lease Area- 11.00 ha (27.18 acre) is an approved mining project in Dera Arwari, Baberu, Banda, Uttar Pradesh. The site covers 433.1 acres.
Who is building it?
The applicant is Neo Crusher Mining Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.
Where is it?
In Dera Arwari, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹49.7 crore and a site of 433.1 acres.
When was it filed?
The application was filed on 18 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Feb 2026 |
| Application filed | 18 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Neo Crusher Mining Private Limited |
| Land area | 433.1 acres (175.3 ha) |
| Project cost | ₹49.7 crore |
| Village / locality | Dera Arwari |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03642 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Oct 2025 (this page) | Environmental approval granted | 433.1 acres | ₹49.7 crore |
| Early planning filed 24 Aug 2024 | Cleared for impact study | 433.1 acres | ₹49.7 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 433.1 acres, this one is larger than 99% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 487.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Dera Arwari, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — cleared for impact study, 0 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 300 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 300 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 400 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 400 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 600 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 600 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — more information requested, 850 m away
More from Neo Crusher Mining Private Limited in Banda
- Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher… — under environmental review
3 Neo Crusher Mining projects in Banda
All 5 Neo Crusher Mining projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.