What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1396G Khand No. 03, Area 20.242 ha

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1396G Khand No. 03, Area 20.242 ha is a proposed mining project in Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres. Its stated project cost is ₹7.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Jul 2024).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1396G Khand No. 03, Area 20.242 ha is a proposed mining project in Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres.

Who is building it?

The applicant is Mohammd Ahmad.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Jul 2024), as of 27 Nov 2026.

Where is it?

In Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹7.2 crore and a site of 50 acres.

When was it filed?

The application was filed on 10 May 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata…

Project details

Official titleProposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 1396G Khand No. 03, Area 20.242 ha in Village- Bhedi Khurd, Tehsil- Kalpi, District- Jalaun, Uttar Pradesh of Shri Mohammd Asif Ahmad
StatusCleared for impact study
Status since3 Jul 2024
Application filed10 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMohammd Ahmad
Land area50 acres (20.2 ha)
Project cost₹7.2 crore
Village / localityBhenri Khurd
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02146

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 15 Nov 2024Environmental approval granted50 acres₹7.2 crore
Early planning filed 10 May 2024 (this page)Cleared for impact study50 acres₹7.2 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.

No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.

Where it is

Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.