Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is an approved mining project in Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Meera Devi Rai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.
Where is it?
In Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 50 acres.
When was it filed?
The application was filed on 30 Sept 2025.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village-Bhedikhurd, Gata No.- 1396 ग, Khand No.- 02, Lease Area- 20.2420 ha.(50.00 Acre), Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s M.R. Construction (Prop.- Smt. Meera Devi Rai) |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Feb 2026 |
| Application filed | 30 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Meera Devi Rai |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Bhenri Khurd |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03714 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Sept 2025 (this page) | Environmental approval granted | 50 acres | ₹90 lakh |
| Early planning filed 22 Oct 2024 | Cleared for impact study | 50 acres | ₹90 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 0 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 500 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 500 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — environmental approval granted, 1.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — cleared for impact study, 1.1 km away
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — environmental approval granted, 1.9 km away
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — cleared for impact study, 1.9 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1396 ग (Khand- 05),… — under environmental review, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.