What is Developing? Open the mapMap

Environmental approval grantedMining · Unnao, Uttar Pradesh

proposed "Ordinary Soil Excavation Project" at Gata No. 1955, Mining Lease Area 1.5330 ha, Village- Bibipur Chiryari, Tehsil Hasanganj, District Unnao, Uttar Pradesh.

proposed "Ordinary Soil Excavation Project" at Gata No. 1955, Mining Lease Area 1.5330 ha, Village- Bibipur Chiryari, Tehsil Hasanganj, District Unnao, Uttar Pradesh is an approved mining project in Bibipur Chiryari, Hasanganj, Unnao, Uttar Pradesh. The site covers 3.8 acres. Its stated project cost is ₹15 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Oct 2024).

See it on the live map All projects in Unnao

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

proposed "Ordinary Soil Excavation Project" at Gata No. 1955, Mining Lease Area 1.5330 ha, Village- Bibipur Chiryari, Tehsil Hasanganj, District Unnao, Uttar Pradesh is an approved mining project in Bibipur Chiryari, Hasanganj, Unnao, Uttar Pradesh. The site covers 3.8 acres.

Who is building it?

The applicant is Priyanka Agarwal.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 Oct 2024), as of 27 Nov 2026.

Where is it?

In Bibipur Chiryari, Hasanganj, Unnao, Uttar Pradesh.

How big is it?

It has a stated cost of ₹15 lakh and a site of 3.8 acres.

When was it filed?

The application was filed on 21 Aug 2024.

Project details

StatusEnvironmental approval granted
Status since16 Oct 2024
Application filed21 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantPriyanka Agarwal
Land area3.8 acres (1.5 ha)
Project cost₹15 lakh
Village / localityBibipur Chiryari
Taluk / tehsilHasanganj
DistrictUnnao
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02387

In context

72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.8 acres, this one is larger than 76% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Bibipur Chiryari, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.