Quick answers
What is this project?
Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road and Its Protective Work on Sai River Near Mohan is an approved road project in Mohanpur Khurd, Hasanganj, Unnao, Uttar Pradesh. The site covers 1.5 acres.
Who is building it?
The applicant is Bridge Construction Unit III Lucknow.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 2 Apr 2026), as of 27 Nov 2026.
Where is it?
In Mohanpur Khurd, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17.3 crore; a site of 1.5 acres and 1,320 m² of forest land.
When was it filed?
The application was filed on 14 Feb 2024.
Project details
| Official title | Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road and Its Protective Work on Sai River Near Mohan in District:- Unnao |
|---|---|
| Status | Forest land use approved |
| Status since | 2 Apr 2026 |
| Application filed | 14 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bridge Construction Unit III Lucknow |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1,320 m² |
| Project cost | ₹17.3 crore |
| Village / locality | Mohanpur Khurd |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05162 |
In context
7 applications in Unnao since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohanpur Khurd, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- proposed "Ordinary Soil Excavation Project" at Gata No. 1955, Mining Lease… — environmental approval granted, 2.8 km away
- Ordinary Soil Mine — under environmental review, 4.3 km away
- Proposed Kailash Khand & kashi Khand – Varun Vihar Yojana — more information requested, 7.7 km away
- Proposed Forest Land to be Diverted for Construction of Connecting Road — lapsed, 9.3 km away
- "Ordinary Earth Excavation Project" at Gata No.- 491, 525 — environmental approval granted, 10 km away
- Proposed forest Land to be diverted for New Construction of Munna Khera Link… — under forest review, 13.2 km away
- "Ordinary Soil Excavation Project" at Gata No.- 918Kha, 921Ka, Village-… — environmental approval granted, 15 km away
- Ordinary Soil Mine — environmental approval granted, 15 km away
All 13 Bridge Construction Unit projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.