Quick answers
What is this project?
Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda (U.P.) Lease Area: 23.0 Hectares Part of Gata 333/7, 412, 413, 414 Khand No. 04 on River Bed of Ken River is an approved mining project in Marauli Khadar, Banda, Uttar Pradesh. The site covers 56.8 acres.
Who is building it?
The applicant is Muraly Mallampati.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Oct 2024), as of 27 Nov 2026.
Where is it?
In Marauli Khadar, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 56.8 acres.
When was it filed?
The application was filed on 8 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Oct 2024 |
| Application filed | 8 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Muraly Mallampati |
| Land area | 56.8 acres (23 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Marauli Khadar |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02421 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Aug 2024 (this page) | Environmental approval granted | 56.8 acres | ₹1.5 crore |
| Early planning filed 23 Sept 2023 | Cleared for impact study | 56.8 acres | ₹1.5 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 56.8 acres, this one is larger than 83% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 227.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Marauli Khadar, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — cleared for impact study, 50 m away
- Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418,… — lapsed, 300 m away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — under environmental review, 300 m away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — cleared for impact study, 300 m away
- Mining project by M/s Descon Buildtech Pvt Ltd — environmental approval granted, 350 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — under environmental review, 650 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — cleared for impact study, 650 m away
- Sand/Morrum Mine from Riverbed of Ken River, Village- Marauli Khadar, Gata… — environmental approval granted, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.