Quick answers
What is this project?
"Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata No.- Part of 333/7, 418, 421 Mi & 426/30, (Khand No.- 03), Lease area- 23.00 Ha., Tehsil- Banda, District- Banda, Uttar Pradesh, Project Proponent- M/s Intense Construction Pvt. Ltd. (Director- Shri Vinod Kumar Yadav) is a proposed mining project in Marauli Khadar, Banda, Uttar Pradesh. The site covers 56.8 acres.
Who is building it?
The applicant is Intense Constructions Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Marauli Khadar, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹21.6 crore and a site of 56.8 acres.
When was it filed?
The application was filed on 27 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata No.- Part of…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 27 Oct 2026 |
| Application filed | 27 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Intense Constructions Private Limited |
| Land area | 56.8 acres (23 ha) |
| Project cost | ₹21.6 crore |
| Village / locality | Marauli Khadar |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07438 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Oct 2026 (this page) | Under environmental review | 56.8 acres | ₹21.6 crore |
| Early planning filed 31 May 2025 | Cleared for impact study | 56.8 acres | ₹21.6 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 56.8 acres, this one is larger than 83% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 168 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Marauli Khadar, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — cleared for impact study, 0 m away
- Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418,… — lapsed, 0 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — cleared for impact study, 250 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — environmental approval granted, 300 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — under environmental review, 350 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — cleared for impact study, 350 m away
- Mining project by M/s Descon Buildtech Pvt Ltd — environmental approval granted, 600 m away
- Proposed project of Sand/Morrum Mining project of Ken River located at Gata… — under environmental review, 800 m away
More from Intense Constructions Private Limited in Banda
All 3 Intense Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.