What is Developing? Open the mapMap

LapsedMining · Banda, Uttar Pradesh

Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418, 421Mi & 426/30, Khand No. 3, Village- Maraulikhadar, Tehsil- Banda, District- Banda, Uttar Pradesh

Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418, 421Mi & 426/30, Khand No. 3, Village- Maraulikhadar, Tehsil- Banda, District- Banda, Uttar Pradesh is a lapsed mining project in Marauli, Banda, Uttar Pradesh. The site covers 56.8 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 20 Aug 2025).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418, 421Mi & 426/30, Khand No. 3, Village- Maraulikhadar, Tehsil- Banda, District- Banda, Uttar Pradesh is a lapsed mining project in Marauli, Banda, Uttar Pradesh. The site covers 56.8 acres.

Who is building it?

The applicant is Intense Constructions Private Limited.

Has it been approved?

No. The application was lapsed on 20 Aug 2025, so it is no longer under consideration.

Where is it?

In Marauli, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹85 lakh and a site of 56.8 acres.

When was it filed?

The application was filed on 27 Feb 2025.

Project details

StatusLapsed
Status since20 Aug 2025
Application filed27 Feb 2025
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantIntense Constructions Private Limited
Land area56.8 acres (23 ha)
Project cost₹85 lakh
Village / localityMarauli
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03160

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 56.8 acres, this one is larger than 83% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 168 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.

Where it is

Marauli, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Intense Constructions Private Limited in Banda

All 3 Intense Constructions projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.