Quick answers
What is this project?
Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418, 421Mi & 426/30, Khand No. 3, Village- Maraulikhadar, Tehsil- Banda, District- Banda, Uttar Pradesh is a lapsed mining project in Marauli, Banda, Uttar Pradesh. The site covers 56.8 acres.
Who is building it?
The applicant is Intense Constructions Private Limited.
Has it been approved?
No. The application was lapsed on 20 Aug 2025, so it is no longer under consideration.
Where is it?
In Marauli, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 56.8 acres.
When was it filed?
The application was filed on 27 Feb 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Aug 2025 |
| Application filed | 27 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Intense Constructions Private Limited |
| Land area | 56.8 acres (23 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Marauli |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03160 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 56.8 acres, this one is larger than 83% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 168 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Marauli, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — under environmental review, 0 m away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — cleared for impact study, 0 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — cleared for impact study, 250 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — environmental approval granted, 300 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — under environmental review, 350 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — cleared for impact study, 350 m away
- Mining project by M/s Descon Buildtech Pvt Ltd — environmental approval granted, 600 m away
- Proposed project of Sand/Morrum Mining project of Ken River located at Gata… — under environmental review, 800 m away
More from Intense Constructions Private Limited in Banda
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — under environmental review
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — cleared for impact study
All 3 Intense Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.