Quick answers
What is this project?
Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA) is a lapsed industrial project in Pahur, Bindki, Fatehpur, Uttar Pradesh. The site covers 46.5 acres.
Who is building it?
The applicant is Dalmia Bharat Green Vision Limited.
Has it been approved?
No. The application was lapsed on 21 Apr 2026, so it is no longer under consideration.
Where is it?
In Pahur, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹765 crore and a site of 46.5 acres.
When was it filed?
The application was filed on 25 Jan 2024.
Project details
| Official title | Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA) At Village - Pahur, Tehsil - Bindki, District - Fatehpur, Uttar Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 21 Apr 2026 |
| Application filed | 25 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Dalmia Bharat Green Vision Limited |
| Land area | 46.5 acres (18.8 ha) |
| Project cost | ₹765 crore |
| Village / locality | Pahur |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02481 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pahur, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Stand-alone Grinding Unit — cleared for impact study, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — forest land use approved, 2.8 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — lapsed, 2.9 km away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 5.7 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 6.4 km away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 7.2 km away
- Widening of Remaining Portion of Pukhraya Ghatampur-Bindki (Bakewar To Bindki)… — lapsed, 7.6 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Bharat… — forest land use approved, 7.8 km away
More from Dalmia Bharat Green Vision Limited in Fatehpur
- Proposed Stand-alone Grinding Unit — cleared for impact study