Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on NH-19 (Old NH-2) in Km. 522-523 (Ch. 522+230 RHS) at Gata No. 250, Village: Kanspur Gugauli ,Tehsil-Bindki, District: Fatehpur (Uttar Pradesh) is an approved fuel station in Kanspur Gugauli, Bindki, Fatehpur, Uttar Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Hemant Kumar.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 24 Oct 2024), as of 27 Nov 2026.
Where is it?
In Kanspur Gugauli, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.6 acres and 290 m² of forest land.
When was it filed?
The application was filed on 7 May 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 24 Oct 2024 |
| Application filed | 7 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hemant Kumar |
| Land area | 2,500 m² |
| Forest land | 290 m² |
| Project cost | ₹45 lakh |
| Village / locality | Kanspur Gugauli |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06780 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.6 acres, this one is smaller than 78% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanspur Gugauli, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 750 m away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 1.1 km away
- Ordinary Soil Excavation Project — environmental approval granted, 2.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach of… — lapsed, 3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 3 km away
- Proposed Stand-alone Grinding Unit — cleared for impact study, 6.4 km away
- Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0… — lapsed, 6.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — forest land use approved, 7.2 km away
More from Hemant Kumar in Fatehpur
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — in-principle approval, conditions pending
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.