Quick answers
What is this project?
Widening of Remaining Portion of Pukhraya Ghatampur-Bindki (Bakewar To Bindki) Road SH-46 From Ch. 0000 to Ch. 13.316 (Length Km. 13.316) is a lapsed road project in Bharsa, Bindki, Fatehpur, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Construction Division II Up Pwd Fatehpur.
Has it been approved?
No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.
Where is it?
In Bharsa, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹25.8 crore; a site of 4.9 acres and 4.9 acres (2 ha) of forest land.
When was it filed?
The application was filed on 30 Jul 2024.
Project details
| Official title | Widening of Remaining Portion of Pukhraya Ghatampur-Bindki (Bakewar To Bindki) Road SH-46 From Ch. 0000 to Ch. 13.316 (Length Km. 13.316) in district Fatehpur (Uttar Pradesh) |
|---|---|
| Status | Lapsed |
| Status since | 23 Oct 2024 |
| Application filed | 30 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Construction Division II Up Pwd Fatehpur |
| Land area | 4.9 acres (2 ha) |
| Forest land | 4.9 acres (2 ha) |
| Project cost | ₹25.8 crore |
| Village / locality | Bharsa |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06143 |
In context
11 applications in Fatehpur since January 2022 are in the same category (Roads & highways): 2 approved, 0 filed or under review, and 9 withdrawn, lapsed or rejected. At 4.9 acres, this one is larger than 50% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bharsa, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 5 km away
- Proposed Stand-alone Grinding Unit — cleared for impact study, 7.6 km away
- Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0… — lapsed, 7.6 km away
- Protected Forest Land proposed to be diverted for the Widening and… — lapsed, 9.1 km away
- Bharat Net — lapsed, 9.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — forest land use approved, 10.4 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — lapsed, 10.4 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 10.7 km away
More from Construction Division II Up Pwd Fatehpur in Fatehpur
- Protected Forest Land proposed to be diverted for the Widening and… — lapsed
- Widening of Jahanabad-Amauli-Chandpur-Jafarganj-Jonihan Road (MDR-25) From Ch.… — lapsed
- Widening of Fatehpur-Baberu-Attara-Naraini-Kartal Marg (SH-71) From Ch. 1.100… — lapsed
All 4 Construction Division II projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.