Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal Energy Limited Retail Outlet is an approved fuel station in Gudhrauli, Bindki, Fatehpur, Uttar Pradesh. The site covers 3.9 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Apr 2026), as of 27 Nov 2026.
Where is it?
In Gudhrauli, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh; a site of 3.9 acres and 640 m² of forest land.
When was it filed?
The application was filed on 7 Apr 2026.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal Energy Limited Retail Outlet at Village:- Godhrauli, Tehsil:- Bindki, District:- Fatehpur (U.P.) |
|---|---|
| Status | Forest land use approved |
| Status since | 23 Apr 2026 |
| Application filed | 7 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3.9 acres (1.6 ha) |
| Forest land | 640 m² |
| Project cost | ₹75 lakh |
| Village / locality | Gudhrauli |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06086 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.9 acres, this one is larger than 98% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gudhrauli, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — lapsed, 50 m away
- Proposed Stand-alone Grinding Unit — cleared for impact study, 2.8 km away
- Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0… — lapsed, 2.8 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Bharat… — forest land use approved, 5.5 km away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 6.2 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 7.2 km away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 7.8 km away
- Ordinary Soil Excavation Project — environmental approval granted, 8 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Fatehpur
10 Hindustan Petroleum Corporation (HPCL) projects in Fatehpur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.