Quick answers
What is Ordinary Soil Excavation Project?
Ordinary Soil Excavation Project is a lapsed mining project in Neolapur, Safipur, Unnao, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Adeeba Bano.
Has it been approved?
No. The application was lapsed on 14 Nov 2024, so it is no longer under consideration.
Where is it?
In Neolapur, Safipur, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹7 lakh and a site of 0.7 acres.
When was it filed?
The application was filed on 21 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Nov 2024 |
| Application filed | 21 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Adeeba Bano |
| Land area | 2,900 m² |
| Project cost | ₹7 lakh |
| Village / locality | Neolapur |
| Taluk / tehsil | Safipur |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02553 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.7 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Neolapur, Safipur, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Project at Gata No.- 754, Village- Hafijabad,… — under environmental review, 3.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 6.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — lapsed, 6.6 km away
- proposed "Ordinary Soil Excavation Project" at Gata No. 400, 406 kh, 442, 526,… — environmental approval granted, 7.6 km away
- proposed "Ordinary Soil Excavation Project" at Gata No. 400, 406 kh, 442, 526,… — lapsed, 7.6 km away
- Proposed "Ordinary Soil Mining Project" at Gata 118Kha & 173Kha — environmental approval granted, 8 km away
- Diversion of Reserve Forest Land for Non-Forestry Purpose for "diversion of… — in-principle approval, conditions pending, 9.7 km away
- "Ordinary Soil Mining Project" at Gata No.- 541 & 543 — environmental approval granted, 10.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.