Quick answers
What is this project?
Diversion of Reserve Forest Land for Non-Forestry Purpose for "diversion of Existing 400 KV D/C Lucknow-Kanpur Tl for Location Infringing With Proposed Ganga Expressway" Under Jurisdiction of Unnao Social Forestry Division.(Forest Area 0.1918 Ha) by POWERGRID is a proposed power project in Nawabad Grant, Safipur, Unnao, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Power Grid Corporation of India (POWERGRID).
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Nawabad Grant, Safipur, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹12 crore; a site of 0.8 acres and 1,920 m² of forest land.
When was it filed?
The application was filed on 15 Mar 2023.
Project details
| Official title | Proposal for Diversion of Reserve Forest Land for Non-Forestry Purpose for "diversion of Existing 400 KV D/C Lucknow-Kanpur Tl for Location Infringing With Proposed Ganga Expressway" Under Jurisdiction of Unnao Social Forestry Division.(Forest Area 0.1918 Ha) |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 25 Apr 2026 |
| Application filed | 15 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 3,100 m² |
| Forest land | 1,920 m² |
| Project cost | ₹12 crore |
| Village / locality | Nawabad Grant |
| Taluk / tehsil | Safipur |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05233 |
Where it is
Nawabad Grant, Safipur, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Project — lapsed, 9.7 km away
- Miyaganj Sandila T4 to Dhanmahukhera — lapsed, 12.1 km away
- Ordinary Soil Excavation Project at Gata No.- 754, Village- Hafijabad,… — under environmental review, 12.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — lapsed, 12.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 12.6 km away
- "Ordinary Soil Mining Project" at Gata No.- 541 & 543 — environmental approval granted, 15.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 15.2 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 15.7 km away
All 45 Power Grid Corporation of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.