What is this project?
Proposed Project of "Sand/Morrum Mine" Gata No. 01, 02, 03, 04, 05, 06, 01, 10, 11, 12, 13, 14, 15 Khand No. 24/9 over an area of 12.145 Hectares Village – Hardua, Sujagwa, Tehsil – Sarila, District- Hamirpur, M/s Mahakal Construction Proponent- Shri Yash Yadav is a proposed mining project in Hardua, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres.
Who is building it?
The applicant is Yash Yadav.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Mar 2026), as of 27 Nov 2026.
Where is it?
In Hardua, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 30 acres.
When was it filed?
The application was filed on 31 Dec 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Mar 2026 |
| Application filed | 31 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Yash Yadav |
| Land area | 30 acres (12.2 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Hardua |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-02587 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is smaller than 87% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 80 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 16 mining leases have applied within 5 km.
Where it is
Hardua, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Sand/ Morrum Mining from Betwa River — cleared for impact study, 450 m away
- Chikasi Sand/Morrum Mining Project on Betwa River — environmental approval granted, 1.4 km away
- Chikasi Sand/Morrum Mining Project on Betwa River — cleared for impact study, 1.4 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Betwa River at… — under environmental review, 2.3 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Betwa River at… — cleared for impact study, 2.3 km away
- Proposed project of Sand/Morrum Mining project at Khand No.-24/13, Gata No.-… — under environmental review, 2.5 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 3.1 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.