Quick answers
What is this project?
Diversion of Protected forest land for non-forest purpose for construction of proposed ATGL's CGS Station, CNG Station (Mother Station & Dispensing), Administration Building, Control Room Building , Store Area and Approach at Survey No. 530 & 531, within ROW of NH-27 (Shivpuri to Jhansi Road) at KM. 1373.930 (LHS), Village Raksha, Jhansi Tehsil of Jhansi District (Uttar Pradesh) is a lapsed road project in Raksa, Jhansi, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Adani Total Gas Limited.
Has it been approved?
No. The application was lapsed on 6 Jun 2025, so it is no longer under consideration.
Where is it?
In Raksa, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹22.8 crore; a site of 0.2 acres and 790 m² of forest land.
When was it filed?
The application was filed on 30 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Jun 2025 |
| Application filed | 30 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Adani Total Gas Limited |
| Land area | 800 m² |
| Forest land | 790 m² |
| Project cost | ₹22.8 crore |
| Village / locality | Raksa |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07062 |
In context
12 applications in Jhansi since January 2022 are in the same category (Roads & highways): 1 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 100% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raksa, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 4" Ø Steel (600 class,API5LX42,6.4mm wall thickness) Gas pipeline by… — lapsed, 150 m away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 3.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 3.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 4.2 km away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — environmental approval granted, 4.6 km away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — cleared for impact study, 4.6 km away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — returned to applicant, 4.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.4 km away
More from Adani Total Gas Limited in Jhansi
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested
All 48 Adani Total Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.