Quick answers
What is this project?
Proposed 4" Ø Steel (600 class,API5LX42,6.4mm wall thickness) Gas pipeline by GAIL is a lapsed pipeline project in Raksa, Jhansi, Uttar Pradesh. The site covers 0 acres.
Who is building it?
The applicant is GAIL (India) Limited (GAIL).
Has it been approved?
No. The application was lapsed on 7 Jul 2026, so it is no longer under consideration.
Where is it?
In Raksa, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore; a site of 0 acres and 140 m² of forest land.
When was it filed?
The application was filed on 8 May 2024.
Project details
| Official title | Proposed 4" Ø Steel (600 class,API5LX42,6.4mm wall thickness) Gas pipeline along with OFC cable along National Highway - 27 (Shivpuri to Jhansi) from GAIL IP-02 Raksha to M/s Adani Gas Limited CGS in Raksha Village, Tehsil- Jhansi of Jhansi District in Uttar Pradesh State |
|---|---|
| Status | Lapsed |
| Status since | 7 Jul 2026 |
| Application filed | 8 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | GAIL (India) Limited (GAIL) |
| Land area | 100 m² |
| Forest land | 140 m² |
| Project cost | ₹1.4 crore |
| Village / locality | Raksa |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05847 |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raksa, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected forest land for non-forest purpose for construction of… — lapsed, 150 m away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 3.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 3.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 4.1 km away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — environmental approval granted, 4.6 km away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — cleared for impact study, 4.6 km away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — returned to applicant, 4.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.2 km away
More from GAIL (India) Limited (GAIL) in Jhansi
- Dedicated C2/C3 pipeline from GAIL Vijaipur to GAIL Pata - Uttar Pradesh Section — in-principle approval, conditions pending
All 86 GAIL (India) (GAIL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.