Quick answers
What is this project?
Vision Document & Master Plan 2045 for Bundelkhand Industrial Development Authority (BIDA), Jhansi District, Uttar Pradesh is a proposed industrial project in Amarpur, Jhansi, Uttar Pradesh. The site covers 62,599.1 acres.
Who is building it?
The applicant is Bundelkhand Industrial Development Authority.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Amarpur, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹14,811 crore and a site of 62,599.1 acres.
When was it filed?
The application was filed on 2 Apr 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 3 May 2025 |
| Application filed | 2 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bundelkhand Industrial Development Authority |
| Land area | 62,599.1 acres (25,333 ha) |
| Project cost | ₹14,811 crore |
| Village / locality | Amarpur |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02828 |
In context
5 applications in Jhansi since January 2022 are in the same category (Industry): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amarpur, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — environmental approval granted, 0 m away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — cleared for impact study, 0 m away
- Diversion of Protected forest land for non-forest purpose for construction of… — lapsed, 4.6 km away
- Proposed 4" Ø Steel (600 class,API5LX42,6.4mm wall thickness) Gas pipeline by… — lapsed, 4.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 6.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 6.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 7.5 km away
More from Bundelkhand Industrial Development Authority in Jhansi
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — environmental approval granted
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — cleared for impact study
All 3 Bundelkhand Industrial Development Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.