Quick answers
What is this project?
Vision Document & Master Plan 2045 for Bundelkhand Industrial Development Authority (BIDA), Jhansi District, Uttar Pradesh is an approved industrial project in Bamer, Jhansi, Uttar Pradesh. The site covers 62,599.1 acres.
Who is building it?
The applicant is Bundelkhand Industrial Development Authority.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 May 2026), as of 27 Nov 2026.
Where is it?
In Bamer, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,51,571 crore and a site of 62,599.1 acres.
When was it filed?
The application was filed on 17 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 May 2026 |
| Application filed | 17 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Bundelkhand Industrial Development Authority |
| Land area | 62,599.1 acres (25,333 ha) |
| Project cost | ₹1,51,571 crore |
| Village / locality | Bamer |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04195 |
In context
5 applications in Jhansi since January 2022 are in the same category (Industry): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamer, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — cleared for impact study, 0 m away
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — returned to applicant, 0 m away
- Diversion of Protected forest land for non-forest purpose for construction of… — lapsed, 4.6 km away
- Proposed 4" Ø Steel (600 class,API5LX42,6.4mm wall thickness) Gas pipeline by… — lapsed, 4.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 6.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 6.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 7.5 km away
More from Bundelkhand Industrial Development Authority in Jhansi
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — cleared for impact study
- Vision Document & Master Plan 2045 for Bundelkhand Industrial Development… — returned to applicant
All 3 Bundelkhand Industrial Development Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.