Quick answers
What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?
"Ordinary Sand Mining" from Riverbed of Ghaghra River is a proposed mining project in Mahdwapar Khurd, Basti, Uttar Pradesh. The site covers 24.7 acres.
Who is building it?
The applicant is Santosh Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Mahdwapar Khurd, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹97 lakh and a site of 24.7 acres.
When was it filed?
The application was filed on 29 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" from Riverbed of Ghaghra River
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Mahuapaar Khurd, Gata No.- 391क /67, Lease area- 10.00 ha., Tehsil- Basti Sadar, District- Basti, Uttar Pradesh, Project Proponent- M/s Maa Aadi Shakti Enterprises (Prop. - Shri Santosh Kumar) |
|---|---|
| Status | Cleared for impact study |
| Status since | 26 Nov 2024 |
| Application filed | 29 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Santosh Kumar |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹97 lakh |
| Village / locality | Mahdwapar Khurd |
| Taluk / tehsil | Basti |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01937 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Feb 2025 | Environmental approval granted | 24.7 acres | ₹97 lakh |
| Early planning filed 29 Jan 2024 (this page) | Cleared for impact study | 24.7 acres | ₹97 lakh |
In context
18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.7 acres, this one is larger than 67% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Mahdwapar Khurd, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 0 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 3 km away
- Proposed Grain Based Distillery Capacity – 60 Kld by M/S Shree Vinod… — environmental approval granted, 12 km away
- Proposed Grain Based Distillery Capacity – 60 Kld by M/S Shree Vinod… — cleared for impact study, 12 km away
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — under environmental review, 15.1 km away
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — cleared for impact study, 15.1 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — environmental approval granted, 15.5 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 15.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.