Quick answers
What is this project?
"no Increase in Pollution Load Certificate" for Proposed Expansion of Ethanol Grain-Based Distillery Unit From 100 Kld to 130 Kld Due Process Optimization and Increasing Process Efficiency is a proposed industrial building project in Baharawali, Chhata, Mathura, Uttar Pradesh. The site covers 12.6 acres.
Who is building it?
The applicant is Allianz Distillery Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Baharawali, Chhata, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 12.6 acres.
When was it filed?
The application was filed on 3 Oct 2025.
Project details
| Official title | "no Increase in Pollution Load Certificate" for Proposed Expansion of Ethanol Grain-Based Distillery Unit From 100 Kld to 130 Kld Due Process Optimization and Increasing Process Efficiency at Village: Baharawali, Tehsil - Chhata, District: Mathura, Uttar Pradesh of M/S Allianz Distillery Limited. |
|---|---|
| Status | Initial checks |
| Status since | 3 Oct 2025 |
| Application filed | 3 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Allianz Distillery Limited |
| Use | Industrial |
| Land area | 12.6 acres (5.1 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Baharawali |
| Taluk / tehsil | Chhata |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02836 |
In context
21 applications in Mathura since January 2022 are in the same category (Buildings & townships): 6 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.6 acres, this one is larger than 76% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baharawali, Chhata, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in EC of Grain based Ethanol Distillery capacity 100 KLD — lapsed, 0 m away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 7.5 km away
- Hopsital and Educational Building (SKS Mathura) on Khasra No. 713, 716, 717,… — under environmental review, 11.7 km away
- Diversion of reserved forest land (0.7871 hect.) for upgradation and… — more information requested, 11.9 km away
- Diversion of protected forest land for Construction of approach road to the… — under forest review, 13.1 km away
- The Diversion of Road Side Protected Forest Land on… — forest land use approved, 13.4 km away
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — environmental approval granted, 13.5 km away
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — cleared for impact study, 13.5 km away
More from Allianz Distillery Limited in Mathura
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.