Quick answers
What is this project?
Amendment in EC of Grain based Ethanol Distillery capacity 100 KLD is a lapsed industrial project in Baharawali, Chhata, Mathura, Uttar Pradesh. The site covers 12.6 acres.
Who is building it?
The applicant is Allianz Distillery Limited.
Has it been approved?
No. The application was lapsed on 29 Sept 2026, so it is no longer under consideration.
Where is it?
In Baharawali, Chhata, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5 lakh and a site of 12.6 acres.
When was it filed?
The application was filed on 27 Apr 2026.
Project details
| Official title | Amendment in EC of Grain based Ethanol Distillery capacity 100 KLD along with Co-gen power of 4.0 MW (wherein amendment of fuel as Biomass / Coal / RDF + Biomass or Coal) at Khasra No. 677, 679, 680, 681, 682, 683, 686, 687mi, 688, 689, 690 in Village –Baharawali, Tehsil - Chhata, District - Mathura, Uttar Pradesh -281401 of M/S Allianz Distillery Ltd |
|---|---|
| Status | Lapsed |
| Status since | 29 Sept 2026 |
| Application filed | 27 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Allianz Distillery Limited |
| Land area | 12.6 acres (5.1 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Baharawali |
| Taluk / tehsil | Chhata |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04897 |
In context
5 applications in Mathura since January 2022 are in the same category (Industry): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baharawali, Chhata, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "no Increase in Pollution Load Certificate" for Proposed Expansion of Ethanol… — initial checks, 0 m away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 7.5 km away
- Hopsital and Educational Building (SKS Mathura) on Khasra No. 713, 716, 717,… — under environmental review, 11.7 km away
- Diversion of reserved forest land (0.7871 hect.) for upgradation and… — more information requested, 11.9 km away
- Diversion of protected forest land for Construction of approach road to the… — under forest review, 13.1 km away
- The Diversion of Road Side Protected Forest Land on… — forest land use approved, 13.4 km away
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — environmental approval granted, 13.5 km away
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — cleared for impact study, 13.5 km away
More from Allianz Distillery Limited in Mathura
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.