Quick answers
What is this project?
Diversion of protected forest land for Construction of approach road to the retail outlet of HPCL-Mittal Energy Limited located on Chhata-Shergarh-Naujhil-Bajna-Gaumat Road (MDR-139) km stone no. 12 (Chainage-11.315, R.H.S) at Khasra No. 225/5, Village- Adampur, Tehsil- Chhata, District- Mathura (Uttar Pradesh) is an approved fuel station in Adampur, Chhata, Mathura, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 14 Aug 2026), as of 27 Nov 2026.
Where is it?
In Adampur, Chhata, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 1 acre and 1,980 m² of forest land.
When was it filed?
The application was filed on 21 Apr 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 14 Aug 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1 acres (0.4 ha) |
| Forest land | 1,980 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Adampur |
| Taluk / tehsil | Chhata |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05138 |
In context
9 applications in Mathura since January 2022 are in the same category (Fuel stations): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
Where it is
Adampur, Chhata, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — environmental approval granted, 7.3 km away
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — cleared for impact study, 7.3 km away
- "no Increase in Pollution Load Certificate" for Proposed Expansion of Ethanol… — initial checks, 7.5 km away
- Amendment in EC of Grain based Ethanol Distillery capacity 100 KLD — lapsed, 7.5 km away
- Diversion of reserved forest land (0.7871 hect.) for upgradation and… — more information requested, 8.9 km away
- Samauli Khadar Sand Mining Project, Located on river bed of Yamuna River… — environmental approval granted, 11.5 km away
- Samauli Khadar Sand Mining Project, Located on river bed of Yamuna River… — cleared for impact study, 11.5 km away
- Roopnagar Khadar Sand Mining Project, Located on river bed of Yamuna River… — cleared for impact study, 13.8 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Mathura
- Diversion of protected forest land for Construction of approach road to the… — under forest review
5 Hindustan Petroleum Corporation (HPCL) projects in Mathura
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.