One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River
Project details
| Official title | "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River at Village- Dillipur, Gata No.- 550, Lease area- 18.00 ha., Tehsil- Gunnaur, District- Sambhal, Uttar Pradesh, Project Proponent- M/s S.S. Infratech (Prop. - Shri Raj Kumar Sharma) |
|---|---|
| Status | Cleared for impact study |
| Status since | 10 Jun 2025 |
| Application filed | 6 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Raj Sharma |
| Land area | 44.5 acres (18 ha) |
| Project cost | ₹10 crore |
| Village / locality | Ramghat Bangar |
| Taluk / tehsil | Debai |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02838 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Sept 2025 | Environmental approval granted | 44.5 acres | ₹10 crore |
| Early planning filed 6 May 2025 (this page) | Cleared for impact study | 44.5 acres | ₹10 crore |
In context
8 applications in Bulandshahr since January 2022 are in the same category (Mining): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Ramghat Bangar, Debai, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — environmental approval granted, 0 m away
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — lapsed, 0 m away
- Proposed Project of riverbed Ordinary Sand Mining project located on Ganga… — initial checks, 4.1 km away
- Proposed Project of riverbed Ordinary Sand Mining project located on Ganga… — under environmental review, 4.1 km away
- Sand Mining at Ganga Riverbed, — environmental approval granted, 4.7 km away
- Bailone Soil Mining Project — initial checks, 9.4 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 21 km away
- Project for Forest Clearence:- लोक निर्माण विभाग ,प्रांतीय डिवीजन ,बुलंदशहर… — lapsed, 34.3 km away
More from Raj Sharma in Bulandshahr
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.