What is Developing? Open the mapMap

In-principle approval, conditions pendingRoads & highways · Bulandshahr, Uttar Pradesh

Proposed Forest Land to be diverted for Widening and Strengthening of Road

Proposed Forest Land to be diverted for Widening and Strengthening of Road is a proposed road project in Daugavan, Debai, Bulandshahr, Uttar Pradesh. The site covers 6.6 acres. Its stated project cost is ₹21 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 26 Nov 2026).

See it on the live map All projects in Bulandshahr

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed Forest Land to be diverted for Widening and Strengthening of Road, in District: Bulandshahr.
StatusIn-principle approval, conditions pending
Status since26 Nov 2026
Application filed11 May 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantProvincial Division Pwd Bulandshahr
Land area6.6 acres (2.7 ha)
Forest land6.6 acres (2.7 ha)
Project cost₹21 crore
Village / localityDaugavan
Taluk / tehsilDebai
DistrictBulandshahr
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05672

In context

17 applications in Bulandshahr since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. At 6.6 acres, this one is larger than 53% of them.

Where it is

Daugavan, Debai, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.