Project details
| Official title | Proposed Project of riverbed Ordinary Sand Mining project located on Ganga River at Khand No. 01, Gata No. 01, Area- 9.8790 ha in Village- Unchagaon Khadar, Tehsil- Dibai, District- Bulandshahr, Uttar Pradesh of M/s Shakti Construction, Prop. Shri Sharad |
|---|---|
| Status | Under environmental review |
| Status since | 21 Aug 2026 |
| Application filed | 13 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sharad |
| Land area | 24.4 acres (9.9 ha) |
| Project cost | ₹74 lakh |
| Village / locality | Unchagaon Khadar |
| Taluk / tehsil | Debai |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04499 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Nov 2026 | Initial checks | 24.4 acres | ₹74 lakh |
| Early planning filed 13 Apr 2026 (this page) | Under environmental review | 24.4 acres | ₹74 lakh |
In context
8 applications in Bulandshahr since January 2022 are in the same category (Mining): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Unchagaon Khadar, Debai, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed Ordinary Sand Mining project located on Ganga… — initial checks, 0 m away
- Sand Mining at Ganga Riverbed, — environmental approval granted, 650 m away
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — environmental approval granted, 4.1 km away
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — cleared for impact study, 4.1 km away
- "Ordinary Sand (Category-I) Mining" from Riverbed of Ganga River — lapsed, 4.1 km away
- Bailone Soil Mining Project — initial checks, 13 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 24.9 km away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 37.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.